perjantai 22. huhtikuuta 2016

WORK PLACEMENT

January 19th. I installed a shower in to an apartment and did some ventilation installation
I installed the second shower next week.  (25.1.16)

January 29th
I installed a toilet with Markus did some preparations for a sink which we unfortunately couldn't install since it was broken when we opened the package due to bad transportation.
January 13th (yes, I apologize these might not be in an order)
 I was in Heinola doing a heating system and securing the heating pipes to the walls and connecting the pipes.

January 28th
I was writing out some questions to a game at shool.

February 2nd
Assemblying the ventilation

February 3rd
I participated in Taitaja Kisat 2016

February 4th
Replacing old air condition valves

February 9th
Testing the awesome learning game

February 11th
We installed a pipe that ventilates the sewer and insulated it.



February 16th
Installation of a sink and a toilet


February 18th
We dismounted the old sinks and installed new composite pipes.

February 19th
I was with a plumber doing regular maintenance at peoples homes

February 23th
I painted some parts and also went to get parts from the whole sale LVI Dahl

February 24th
Transporting materials to the worksite.

February 25th
We had to cut a metal beam and weld it in place under a doorway

March 15th
Insulating the ventilating pipes

March 18th
Dismounted toilets, taps and also insulated ventilation pipes



March 24th
Replaced an old toilet with a new one and checked the company's inventory


March 29th
Taking down the old pipes and disassemblying them.



March 30th
Continuing on disassemblying the pipes.

March 31st
Inventory


April 1st
Oil Burner maintenance

April 5th
Replacing old warm water accumulator with a new one.



April 6th
Inventory

April 8th
Replacing an old warm water accumulator

April 12th
Installed sinks and taps

April 13th
Installed sinks and taps

April 14th
Oil burner maintenance and tap installation

April 15th
Inventory

April 19th
Inventory and oil burner maintenance

April 20th
Sink installation and heating system maintenance

April 21st
warm water accumulator installation

April 22nd
oil burner maintenance

April 26th
Installation of new pipes for drinking water

April 27th
Transported materials to a worksite and did the inventory

April 28th
Replacing pipe connectors and burner installation

May 3th
Radiator installation and installing new pipes

May 4th
Installing new pipes for drinking water

May 10th
orimattilan putkityö received some plumbing parts and I had to put them to the shelves and then we watched ice hockey the rest of the day. 

May 13th
I was at Orimattilan Putkityö taking care of customer service and replacing the store manager for the day.




torstai 7. toukokuuta 2015